07.2026
This publication addresses the diverse challenges of a new type of building based on the new facility in Zuchwil, which will be operational in the summer of 2026. Today, waste treatment is no longer just about thermally utilizing combustible waste and feeding district heating networks – or, as in the past, discreetly disposing of the negative consequences of our consumer society. New facilities must meet the highest requirements for circular economy and climate-friendliness. They should be constructed resource-efficiently, operated economically and ecologically, adaptable and future-proof, and produce CO2-neutral energy. Their facades are to be equipped with photovoltaics or greened, and their surroundings must be climate-friendly and biodiverse. Moreover, they should not only fulfill their function but also embody and convey their social relevance as public buildings. The new energy center kenova achieves this synthesis of form, function, and meaningfulness through intense interdisciplinary collaboration among the planners. The special issue presents the project – and the lessons learned from it.
Published by espazium.ch.
Download