Waste-to-Energy and Wastewater Treatment Plant
Location:
Dietikon, Zurich
Client:
Limeco
Study Assignment:
1. Place
Planning:
from 2025
Realisation:
2026-2034 (Expansion of ARA & Replacement Construction of KVA)
2035-2050 (Replacement Construction of ARA)
Share of services, architecture and civil engineering according to SIA:
100%, general planning
Project description
The existing waste-to-energy plant (KVA) and wastewater treatment plant (ARA) of Limeco in Dietikon must be replaced by 2034 and 2050, respectively. This infrastructural generational project is thoughtfully blended into the sensitive landscape, connecting it with the creation of new natural assets.
The site mediates between the marshalling yard, the industrial zone “Silbern”, and the floodplain landscape of the Limmat River. The linear arrangement of the KVA and ARA is continued based on the master project and is complemented by clear sight axes. Three construction areas of varying widths structure the site, which gently slopes down towards the adjacent settlement structure and nature. Serving as the gateway to the site, the urban square features a public foyer with a café, a recreational area, and a recycling and ReUse centre.
The circular economy plays a central role in utilising resources efficiently. Through urban mining, materials from the demolition of the existing Coop distribution centre will be reused. Thanks to the immediate proximity of the demolition and new construction project, transport distances and temporary storage can be minimized. Sustainable materials are a key component of modern planning. The concrete engineering will feature carbon-reduced cements alongside carbon-infused recycled concrete. Recycled Green Steel sourced in Switzerland is designated for the structural steelwork, while the timber engineering utilises domestic spruce.