Perron roofs, pedestrian underpass, and signal box
Location:
Landquart
Client:
Rhaetian Railway RhB
Planning:
from 2021
Realisation:
2026-2032
Share of services, architecture and civil engineering according to SIA:
100%
Project description
Passenger volume at Landquart station, the gateway to the Grisons, will increase significantly in the coming years. A new shared central platform for the Rhaetian Railway (RhB) and SBB allows for direct transfers between the two rail companies, enabling the implementation of the targeted half-hour service frequency. Based on the 2009 RhB platform roofs, Penzel Valier developed a new uniform roof design for all platforms. Wooden beams are inserted through wide-span steel girders, combining with translucent photovoltaic systems to form a light-permeable roof structure that contributes to sustainable power generation. Wide and bright pedestrian underpasses connect the new platforms. Additionally, a new shared signal box is being built at the northern end of the platform according to plans by Penzel Valier to ensure the safe operation of the tracks.