Power plant and dam facility
Location:
Seestrasse 20, 2575 Hagneck
Client:
Bielersee Power Plants Ltd.
Study assignment:
1. Rank
Planning:
from 2009
Realisation:
2011-2016
Share of services, architecture and civil engineering according to SIA:
60%
Project description
The listed structure of Hagneck is one of the oldest hydropower plants in Switzerland. In the immediate context of this monument to the history of technology, the new Hagneck power plant represents the most modern facility of its kind in Switzerland.
The architecture of the power plant condenses the various technical, volumetric, and spatial aspects into a large figure, a sculpture within the landscape space. By lowering the weir bridge, the horizontal dominance has been decisively reduced, and the terrain connections on both banks have been maintained significantly lower with all necessary embankments and retaining walls. This intervention in the expansive, flat floodplain landscape has been kept gentle and shallow, which is important for the panoramic effect of the facility on the vastness of the lake.
By coloring the concrete in an earthy, ochre yellow tone, which aligns with the color palette of the surrounding Jurassic limestone, the heavy concrete masses visually sink into the ground, integrate and interlock with it, and emerge as part of the landscape. Monochromatic, yet with a gradation in the formwork texture from raw board formwork with varying board widths to an orderly system of smooth shuttering panels, the transition from the landscape-embedded retaining walls and guide walls to the large weir pillars, which rhythmically divide the river space, is traced and structured. Rounded edges of varying radii give the robust weir structure a soft appearance, like stones that have been polished by the force of water for a considerable time.